Tuesday, April 29, 2008
"Rail-ing, Rail-ing"
Sunday, April 20, 2008
Siding with Us
One of the young guys who owns the bobcat we use was on site Saturday. He had previously seen the stacks of siding on the lot, but upon seeing the siding on the wall, for a moment, he thought we changed our minds and went with real cedar siding instead. This stuff looks that good.
The contrast of the light gray trim against the red siding really makes the windows POP!


The Keys to Our Success
Sunday, April 13, 2008
Retaining Water (and dirt)

Walking The Plank
It Makes Me Shutter

Tuesday, April 8, 2008
Curve Ball
One solution is “flex” molding. Pretty expensive, but we’ll only need this for the arched tops of a few windows. We’ll use an off-the-shelf composite brick mold for the straight line trim.
Once in place, the cedar-shake siding can finally be installed. The exterior of the house will pretty much be complete when that is in place.
Monday, April 7, 2008
Beauty And The Beast
Till now the wood has appeared dry and lifeless (see post of March 15). I test stained the jamb of the single door with a mahogany stain, but it was so dark the wood grain almost disappeared. So I merely applied a clear varnish to both doors--a good marine varnish that will protect the wood from weather and UV rays.
There are no words to describe the beauty that lie in these finely-crafted mahogany doors waiting to be released by a glistening finishing coat. Like a magic wand, the wet paintbrush left a burst of rich red huge in its wake—dark streaks of grain showing just beneath. A light sanding or two with a coat of varnish after each, and they'll be perfect.
The beauty of these doors against the back drop of the stone on the front wall left me with the first true rush of excitement as to how wonderful this is all going to turn out. I can't wait.
.

Wednesday, April 2, 2008
AC/DC
I need to get busy wiring CAT-5 and coax cables so we can move to the insulation phase.
Sunday, March 23, 2008
We Got Stoned Last Week
The stone we used is really a stone product. Being made from real stone, it has the touch and feel you expect, but with a fraction of the weight. There are several brands on the market, including Horizon stone http://www.horizon-stone.net/www. This type of product allows you to create features in your home without having to remodel, or design for the necessary structural integrity to support the massive additional weight you would have with real stone.
Additional photos in this post depict the current progress on the upper retaining wall. The lower retaining wall might begin this coming week. Two four-foot walls require less engineering and inspection rules than one eight-foot wall would. Compare these photos to what I tried to depict with my iso-drawing in the post of February 26th. By the way, Google Sketchup http://sketchup.google.com/ is a free, and powerful drawing tool: fun to work with, effective training videos, and clear tutorials. A great way to communicate what's on your mind.

Compare these two photos of the entrance to the photo in the post of February 16.


Compare these two shots to my iso-drawing in the post of February 26th. Keep in mind, this is only of the upper retaining wall. The lower is yet to come.
Saturday, March 15, 2008
The Mortar Merrier


The entry door, and mudroom door are both in place on the front porch.



Tuesday, February 26, 2008
Another Dirty Story
This is an attempt at rendering what it might look like (using Google sketch-up, a free download).
Food and Clothing

The Windows Are The Eyes To The Soul
With a whirlwind of activity, windows were going in everywhere I turned today. With the temp dropping and wind howling, the stillness in the house was a welcome change. Yes, I know. It's Alabama--how bad can it get? But in the midst of this evening's snow flurries, it's hard to remember it was 52 this morning.


Friday, February 22, 2008
Barrels O Fun

Thursday, February 21, 2008
We Have The Shingles
Wednesday, February 20, 2008
Fill It To The Brim
Double-Decker
The keeping room side is pretty close to the ground, as opposed to the master bedroom side, which is about 6' off the ground. We'll put a couple of stairs down to the back yard from the lower side. There will be plenty of room to store a few outside things under the deck. Lattice would look good around the perimeter.


A Plumb Good Job
Saturday, February 16, 2008
Entre Vous, Sivouplait

What A Pile Of......well, Dirt, Actually
We got the first two loads free. On the way to the site Thursday after work, I saw two dump trucks being loaded with dirt at a residential lot. I stopped by and asked to speak with the boss. I asked where they were going to dump the dirt, and convinced him that our building site was closer than his dump site. So, he agreed to dump two loads at our lot for free-- my favorite price! We've continued to use him for the rest of the dirt, as he has charged half the going price.

All Hands On Deck!
Several sections of the roof are a "12 & 12" pitch, which means for every foot horizontal, the roof line goes a foot vertical. In other words, at a 45 degree angle. Tough to deck, and tough to shingle--which will come next week.

Rear: breakfast room (roof still missing here), lodge room, master BR
Monday, February 11, 2008
They've Peaked My Interest



Monday, February 4, 2008
Is it Nice To Stair?
Sunday, January 27, 2008
We've Been Framed!
With two partial days work, the basement rooms, and most of the main floor joists are in place. Main foor walls, decking, and roof should be up in the next week.
Once again, our builder has negotiated lower than normal rates for this effort, while using someone with a good level of credibility. We're over budget to-date, so I hope this will help pull things back in line a little.
More framing each day. It is exciting to finally be able to pick out features (rooms, closets, fireplaces). We need to solidify windows very soon, as the framers need to know the rough openings.
We might be framing the roof in a couple more days.
Sunday, January 13, 2008
Waterboarding?
- Scrape the the outside surface of the block walls to remove any unwanted features (9' tall along the back walls)
- Prime the walls with a blue mastic
- Apply the rubber sheeting (the 67' long roll was pretty heavy to work with)
- Cover the rubber sheeting with a fiber board to protect from damage when back-filling with dirt
- Lay out a drain pipe all along the bottom (this pipe has holes in the bottom and is laid below the slab grade to drain away the bulk of any water that will accumulate during rains)
- Cover the pipe with gravel
- Cover the gravel with landscaping fabric (this keeps dirt from working its way into the gravel)
- Cover the landscaping fabric with gravel
- Cover all with back-fill dirt
A simple recipe, but one quickly becomes aware of why you might choose to pay someone else to do this work. After a good dose of Advil, I slept pretty well each night.
In with our builder's instructions on how to do each step, he warned me about the rubber sheet's tendency to form wrinkles. We worked intently to keep the finished surface wrinkle-free. So much so, that we had comments from both our builder, and the cement block crew chief that they have been in construction for many years, but have never seen a waterproofing job of the precision and quality as we performed. I attribute this high praise to a healthy dose of paranoia, and my faithful family working along side me to make sure our house is done right, to the best of our ability. But please--never again.


Friday, January 4, 2008
What Goes Around, Comes Around
Tuesday, January 1, 2008
Building Walls Between Us